The CJY1.5 Mining Trolley Locomotive is engineered for efficiency and reliability in demanding underground mining operations. With its robust construction and advanced control systems, this locomotive delivers exceptional performance in material transport across narrow-gauge tracks.
Key Features
Frame Construction
Constructed in welded steel and suspended by spring on grease bearing seats with tapered roller bearings for enhanced durability and vibration absorption.
Speed Control
Electronic speed controller provides continuous and stepless speed regulation with high reliability for precise operation in variable conditions.
Braking System
Equipped with a mechanical drum brake to the coupler, ensuring responsive and reliable stopping power in critical situations.
Sanding System
Mechanical sanding system to the rails enhances traction on slippery or inclined surfaces, maintaining operational efficiency in challenging conditions.
Impact Protection
Two buffers with spring shock absorbers achieve complete shock absorption against collisions, protecting both equipment and operators.
Advanced Controller
Available with resistance or IGBT controller options, providing flexibility for different operational requirements and power conditions.
Technical Specifications
| Detailed Specifications |
|---|
| Model | CJY1.5 |
| Adhesive Weight | 1.5 tons |
| Track Gauge | 600, 762 or 900mm |
| Traction | 2.55kN |
| Max. Traction | 3.68kN |
| Speed | 4.54km/h |
| DC Voltage | 100V | 250V |
| Power | 3.5kW * 1 |
| Length | 2340mm |
| Width | 950, 1076 or 1100mm |
| Height | 1550mm |
| Wheelbase | 650mm |
| Wheel Diameter | Φ460mm |
| Pantograph | 1600~2000mm |
| Min. Turning Radius | 5m |
| Controller | Resistance or IGBT |
| Brake Model | Mechanical Brake |